100% Recycling
100% Recycling of the Breakout
The Asphalt Recycler will recycle 100% of breakout material, this means that the top layers from the footway or pavements taken up by the JCB (the only criteria is that the material taken up must be of regular construction of a bituminous footway) will ensure a 100% re-use of breakout material.
On occasion, an additional (up to a maximum of 20kg) 200 pen Bitumen per 4-5 tonne to be recycled may be added.
Time Efficiencies
The advantages of the quick turnaround:
- less disturbance to the public and customers
- a renewed footpath/pavement within a hours and not days
- reducing down time
- reducing disturbance to traffic and pedestrians
TO FIND OUT WHAT WE CAN DO FOR YOU CALL US NOW ON 01530 231861