Method Statement

For the VEB Series of Hot Asphalt Recyclers

Background

The VEB Hot Asphalt Recycler was originally designed and built to fill the requirement for an on-site, easily transportable, free standing asphalt “break-out” recycler due to the rising cost of new asphalt caused by the increasing shortage of natural bitumen.

Recycling Potential

Different from other asphalt “recycling” machines the VEB Series recycles 100% of break-out material up to 5 tonnes every mix depending on the VEB series.

Additional bitumen can be added if the original break-out no longer conforms to modern specifications.

The re-heat and re-mix cycle takes between 8 and 20 minutes this depends on the weather conditions. The Asphalt Recycler produces pre-set temperatures of between 100°C and 180°C. With loading and unloading the total process takes approximately 22-25 minutes. The process can also be used to produce new asphalt and coloured if required.

Benefits

The benefits of the process are numerous and include:

  • Complete operator control of timing and temperature of the asphalt to be laid
  • No raw material costs 
  • Reduction in transport costs to and from asphalt plant and landfill sites 
  • Avoidance of both Landfill Tax and the Aggregates Levy Tax 
  • “Householder” friendly in that sub-base is immediately replaced 
  • Can produce “coloured” asphalt by simple addition of dye during mixing 
  • Perfect for mixing plannings 
  • Overall a substantial reduction in costs compared to existing pathway maintenance methods e.g. the machines use only approximately 7 litres of red 
  • diesel per cycle

Specifications

The basic specifications of the machine are as follows however these may change due to our constant development of the VEB series:

  • the machine can be supplied mobile or static 
  • powered by Deutz 3 cylinder naturally aspirated diesel engine 
  • all drives are hydraulically driven 
  • fired by diesel oil burner with high/low flame control and maximum temperature 
  • shut-down 
  • all electrics issued with Safety Certificates 
  • the recycled asphalt is discharged via a chute 
  • training always provided by qualified operators

The machine can be adapted for specific requests such as other makes of diesel engine.